go to home page  
  Web Solutions > Web Development > Development Life Cycle
 
 
Development Life Cycle

Like the traditional software development, the process of web site development can also be divided into different life cycle steps. This can help to format the team effectively, and the standards and procedures can be adopted to achieve maximum quality.

Note: Throughout this text, The words web sites, web applications, web based applications and Intranet/extranets are interchangeable.

Analysis and Specification Building: Once a customer is started discussing his requirements, the team gets into it, towards the preliminary requirement analysis. As the web site is going to be a part of a system, It needs a complete analysis as, how the web site or the web based application is going to help the present system and how the site is going to help the business. Moreover the analysis should cover all the aspects especially on how the web site is going to join the existing system. The analysis should be done in the way, that it may not be too time consuming or with very less informative. The team should be able to come up with the complete cost- benefit analysis and as the plan for the project. After reviewing and approving the preliminary document, a written proposal is prepared, outlining the scope of the project including responsibilities, timelines and costs.

Input: Interviews with the clients, Mails and supporting docs by the client, Discussions Notes, Online chat, recorded telephone conversations,Model sites/applications etc.,
Output: 1. Work plan, 2. Cost involved, 3. Team requirements, 4. Hardware-software requirements, 5. Supporting documents 6. the approval and 7. Complete requirement specifications to the individuals and the customer/customer's representative.

Design & Development: After building the specification, work on the web site is scheduled upon receipt of the signed proposal, a deposit, and any written content materials and graphics you wish to include. Here normally the layouts and navigation will be designed as a prototype. There can be a lot of suggestions and changes from the customer side, and all the changes should be freezed before moving into the next phase. The revisions could be redisplayed via the web for the customer to view. Throughout the design phase the team should develop test plans and procedures for quality assurance. It is necessary to obtain client approval on design and project plans.

Input: Requirement specification.
Output: Site design with templates, Images and prototype.

Coding: Now its programmers turn to add his code without disturbing the design. Unlike traditional design the developer must know the interface and the code should not disturb the look and feel of the site or application. So the developer should understand the design and navigation. If the site is dynamic then the code should utilize the template. The developer may need to interact with the designer, in order to understand the design.

Input: The site with forms and the requirement specification.
Output: Database driven functions with the site, Coding documents.Testing: Unlike software, web based applications need intensive testing, as the applications will always function as a multi-user system with bandwidth limitations. Some of the testing which should be done are, Integration testing, Stress testing, Scalablity testing, load testing, resolution testing and cross-browser compatibility testing. Both automated testing and manual testing should be done without fail.

After doing all the testing a live testing is necessary for web sites and web based applications. After uploading the site there should be a complete testing(E.g.. Links test)

Input: The site, Requirement specifications, supporting documents, technical specifications and technical documents.
Output: Completed application/site, testing reports, error logs, frequent interaction with the developers and designers.

Promotion: This phase is applicable only for web sites. Promotion needs preparation of meta tags, constant analysis and submitting the URL to the search engines and directories. There is a details article in this site on site promotion, The site promotion is normally an ongoing process as the strategies of search engine may change quite often. Submitting a site URLs once in 2 months can be an ideal submission policy. If the customer is willing, then paid click and paid submissions can also be done with additional cost.

Input: Site with content, Client mails mentioning the competitors.
Output: Site submission with necessary meta tag preparation.

Maintenance and Updating: Web sites will need quite frequent updations to keep them very fresh. In that case we need to do analysis again, and all the other life cycle steps will repeat. Bug fixes can be done during the time of maintenance. Once your web site is operational, ongoing promotion, technical maintenance, content management & updating, site visit activity reports, staff training and mentoring is needed on a regular basis depend on the complexity of your web site and the needs within your organization.

Input: Site/Application, content/functions to be updated, re-Analysis reports.
Output: Updated application, supporting documents to other life cycle steps and teams.

 
 
 
 
  WEB SOLUTIONS
  Designing
  Web Development
       Php Development
       Ajax Development
       .Net Java Development
  e Commerce Solutions
  Open Source Customization
  Content Managament System
   Web Portal Development
  ONLINE MARKETING
  HOSTING SOLUTIONS
  SEO/SEM
  IDREAM CLUB
  IDREAM SUPPORT
 
 
 
 
 
 
 
 
 
 
       

Powered By : iDreamBiz.com